Site Survey
Precise on-site assessment of the facility, documenting hazards and measuring areas and coverage points with specialized tools.

Sahel Al-Aman Co.·General Trading & Contracting
We design, supply, and install fire suppression systems and industrial pumps for government and industrial facilities across Iraq — backed by 15+ years of experience and full compliance with international standards.












For more than 15 years we have delivered fire suppression systems and industrial pumps to government and industrial facilities across Iraq. We work to international standards with certified equipment, and a local technical team that stays with the project from study through commissioning.

Documented hydraulic calculations and full testing before handover.
Clear schedules with weekly reporting through to final handover.
Maintenance contracts and an emergency team covering the governorates.
We cover the full project lifecycle: engineering study, supply, installation, testing and commissioning, then scheduled maintenance.
From the first site inspection to long-term maintenance, every project follows a precise engineering workflow designed for maximum safety.
Precise on-site assessment of the facility, documenting hazards and measuring areas and coverage points with specialized tools.

Shop drawings, hydraulic calculations, and alarm zoning engineered to international standards.

Certified equipment from trusted international brands, matched carefully to each facility.

Field execution by trained crews, clean cable and pipe routing, and strict adherence to schedules and site safety.

Load testing, detector and panel calibration, and documented witnessed commissioning with the client.

Documented periodic inspection programs and a 24/7 emergency team keeping your system fully ready.

Every case study follows a clear structure: the challenge, the engineering solution, and the final result.

Oil & Gas
System installed in 45 days
A strategic fuel depot with large storage tanks lacked a modern suppression system, and the work had to proceed without halting daily filling operations.
We designed a foam and water-cooling system per NFPA 11 and executed installation in coordinated night phases with depot management, including two redundant diesel fire pumps.
Full system handover in 45 days with zero days of operational downtime, passing the regulatory final inspection on the first attempt.

A 400-bed hospital suffered recurring water pressure failures affecting upper wards and operating theaters.

A live data center needed a suppression system that wouldn't damage electronic equipment, with no service interruption allowed during installation.
Fire systems, pumps, and water treatment — scroll through featured products, then open the full catalog.
Send us your project details and our engineering team will respond within 24 hours with a preliminary technical and commercial proposal.